Overall assessment is a portfolio containing 3 tasks: 
i) substructure and inter

Overall assessment is a portfolio containing 3 tasks: 
i) substructure and internal finishes measurement (Part A); 
ii) presentation of quantities in a bill of quantities based on the previous task (Part A); 
iii) sources of information for cost estimation (as realistic as possible) (Part B) 
Remark: 
A. It is an assignment related to Construction Engineering and Quantity Survey. The writer should be familiar with method of measurement in these sectors and following the rules in the related sections of NRM2, building detailed in the drawings and specification issued. 
B. Familiar with the measurement methods using “Dimension Paper” . (Task1) 
C. Familiar with the basic concept of preparing a bill of quantities (BQ). Not just forming items by reading the drawings, but also forming necessary items by reading through the specification. (Task2) 
D. Familiar with the method of cost estimation and critically discuss, using examples, the sources of cost data that could be available to assist in producing a cost estimate (Task 3).
You can download the full set of lecture materials at the below link:
Subject Title(BNV7126 Advanced Quantification)
https://www.dropbox.com/scl/fo/ufldevs00nbbiv4x4l604/h?rlkey=e15xd04aobel3cyaksxa7bpgs&dl=0

Need help with assignments?

Our qualified writers can create original, plagiarism-free papers in any format you choose (APA, MLA, Harvard, Chicago, etc.)

Order from us for quality, customized work in due time of your choice.

Click Here To Order Now